Tuesday, 30 April 2019

Castle Rock - Day 12

The remaining foreground was 'softened' with cheesecloth.
I increased the size of the moss coloured log. Now it needs to be hidden with moss and ferns.
All the large trees were stitched down and a 8 inch (construction size) conifer added to the right and trees/shrubs to the left and right.



Sunday, 28 April 2019

Castle Rock - Day 11

Now construction has moved to the lower half and the middle ground I need to jump around. It's easier to finish a section, left, middle, right.
I added colour to all? the trees. Most are only pinned. As some would receive more direct light at different times of the day I tried to show this with colour on the boles of the tree.

The hoop stitched trees were all destined for the right side. At this point it's wasted effort to hoop construct and not know what is going to cover your work.




Tree height and planned exposure suggests the colour.


These two group sit on the right, partially in shade, under one trunk, over two and tight against another.

.

Friday, 26 April 2019

Castle Rock -Day 9

The morning was spent tacking down all the vegetation I made yesterday and today.

Then I played with the Big trees.


Thursday, 25 April 2019

Castle Rock - Day 8

I must have caught up on my sleep/energy because I got an early start this morning.

I worked on the third overlay using brighter colours to bring the sunlight into the center of the forest.
I had to shift to a larger hoop and found even though my support tulle was too small I was able to increase the size with satisfactory stability by simply pinning another piece of tulle to the edge.

So here are the steps for this morning's piece.



washed and ready to place
 Before I trim these overlays and stitch them down it's time to finalize the tree trunk structure, colour and position
.

The ones in the background are pretty straightforward. Five are locked into the three overlays of brush.